Tyseley ERF
Tyseley ERF is an operational 30 MW energy-from-waste plant in Birmingham, generating since 1 September 1996. Planning permission was granted on 24 February 1994, 3 months after submission. Operator of record: Veolia.
Planning and build timeline
| Application submitted | 12 November 1993 |
| Permission granted | 24 February 1994 3 months after submission |
| Operational | 1 September 1996 30 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Birmingham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tyseley ERF’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Advanced Conversion Technologies · Operational | 10.3 | 0.4 km |
Sewage Sludge Digestion · Operational | 9.7 | 10 km |
Landfill Gas · Operational | 8.5 | 10.2 km |
Anaerobic Digestion · Operational | 2.4 | 11 km |
EfW Incineration · Under Construction | 47 | 12 km |
EfW Incineration · Under Construction | 47 | 12 km |
Battery · Under Construction | 400 | 12.1 km |
Solar Photovoltaics · Operational | 1 | 12.6 km |
How big is Tyseley ERF?
Tyseley ERF has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tyseley ERF?
REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tyseley ERF approved and built?
The application was submitted on 12 November 1993. Permission was granted on 24 February 1994, 3 months later. The site became operational on 1 September 1996, 30 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 816.