Kelvin Energy Recovery Facility is under construction in Sandwell with a recorded capacity of 47 MW.
Planning and build timeline
| Application submitted | 2017-10-20 |
| Permission granted | 2019-09-27 23 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kelvin Energy Recovery Facility EfW Incineration · Under Construction | 47 | 0 km |
DPD Distribution Centre Solar Photovoltaics · Operational | 1 | 0.8 km |
Oldbury Advanced Conversion Technologies · Operational | 40 | 2.4 km |
Golds Hill - Battery Storage Battery · Operational | 57 | 4.6 km |
Edwin Richards Landfill Scheme Landfill Gas · Operational | 1.8 | 4.7 km |
Wednesbury EfW Incineration · Under Construction | 2 | 5.5 km |
Bustleholme Substation Battery · Operational | 49.9 | 5.8 km |
Dudley EfW EfW Incineration · Operational | 7.4 | 6 km |
How big is Kelvin Energy Recovery Facility?
Kelvin Energy Recovery Facility has a recorded installed capacity of 47 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kelvin Energy Recovery Facility?
REPD records the operator as Enfinium Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kelvin Energy Recovery Facility approved and built?
The application was submitted on 2017-10-20. Permission was granted on 2019-09-27, 23 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14685.