Renewable sites › Kelvin Energy Recovery Facility
Kelvin Energy Recovery Facility
Kelvin Energy Recovery Facility is a 47 MW energy-from-waste plant under construction in Sandwell. Planning permission was granted on 27 September 2019, 23 months after submission. Operator of record: Enfinium Energy Limited.
Planning and build timeline
| Application submitted | 20 October 2017 |
| Permission granted | 27 September 2019 23 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Sandwell: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Kelvin Energy Recovery Facility’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
EfW Incineration · Under Construction | 47 | 0 km |
Solar Photovoltaics · Operational | 1 | 0.8 km |
Advanced Conversion Technologies · Operational | 40 | 2.4 km |
Battery · Operational | 57 | 4.6 km |
Landfill Gas · Operational | 1.8 | 4.7 km |
EfW Incineration · Under Construction | 2 | 5.5 km |
Battery · Operational | 49.9 | 5.8 km |
EfW Incineration · Operational | 7.4 | 6 km |
How big is Kelvin Energy Recovery Facility?
Kelvin Energy Recovery Facility has a recorded installed capacity of 47 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kelvin Energy Recovery Facility?
REPD records the operator as Enfinium Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kelvin Energy Recovery Facility approved and built?
The application was submitted on 20 October 2017. Permission was granted on 27 September 2019, 23 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14685.