Novarly ParcelRenewable sites

Renewable sitesKelvin Energy Recovery Facility

Kelvin Energy Recovery Facility

Kelvin Energy Recovery Facility is a 47 MW energy-from-waste plant under construction in Sandwell. Planning permission was granted on 27 September 2019, 23 months after submission. Operator of record: Enfinium Energy Limited.

47 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
EfW Incineration
Technology
Enfinium Energy Limited
Sandwell
Authority
England

Planning and build timeline

Application submitted20 October 2017
Permission granted27 September 2019
23 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Sandwell: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kelvin Energy Recovery Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
EfW Incineration · Under Construction
470 km
Solar Photovoltaics · Operational
10.8 km
Advanced Conversion Technologies · Operational
402.4 km
Battery · Operational
574.6 km
Landfill Gas · Operational
1.84.7 km
EfW Incineration · Under Construction
25.5 km
Battery · Operational
49.95.8 km
EfW Incineration · Operational
7.46 km

How big is Kelvin Energy Recovery Facility?

Kelvin Energy Recovery Facility has a recorded installed capacity of 47 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kelvin Energy Recovery Facility?

REPD records the operator as Enfinium Energy Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kelvin Energy Recovery Facility approved and built?

The application was submitted on 20 October 2017. Permission was granted on 27 September 2019, 23 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14685.