Novarly ParcelRenewable sites

Renewable sitesHams Hall - Battery Energy Storage System

Hams Hall - Battery Energy Storage System

Hams Hall - Battery Energy Storage System is under construction in North Warwickshire with a recorded capacity of 400 MW.

400 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Welbar Energy Storage Limited / Penso Power (BW ESS)
North Warwickshire
Authority
England

Planning and build timeline

Application submitted2021-08-05
Permission granted2022-03-04
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Warwickshire’s record on battery storage

North Warwickshire has decided 8 battery storage schemes and approved 100%, taking a median of 7.1 months. See every battery storage scheme decision in North Warwickshire

Other built sites within 15 km

SiteMWDistance
Coleshill STW (Waste AD)
Anaerobic Digestion · Operational
2.41.9 km
Minsworth Sewage Treatment Works
Sewage Sludge Digestion · Operational
9.72.7 km
Packington Generation Plant Phase 3
Landfill Gas · Operational
8.57.5 km
Wilnecote Landfill Site
Landfill Gas · Operational
17.6 km
Land South of Pogmore Spinney
Solar Photovoltaics · Operational
58.9 km
Merevale & Blyth Estate (Waste AD)
Anaerobic Digestion · Operational
29.6 km
Merevale & Blyth Estate (Biomass Plant)
Biomass (dedicated) · Operational
2.59.6 km
Birmingham Bio-Power Plant
Advanced Conversion Technologies · Operational
10.311.9 km

How big is Hams Hall - Battery Energy Storage System?

Hams Hall - Battery Energy Storage System has a recorded installed capacity of 400 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hams Hall - Battery Energy Storage System?

REPD records the operator as Welbar Energy Storage Limited / Penso Power (BW ESS). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hams Hall - Battery Energy Storage System approved and built?

The application was submitted on 2021-08-05. Permission was granted on 2022-03-04, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9427.