Packington Generation Plant Phase 3

Packington Generation Plant Phase 3 is an operational 8.5 MW landfill gas site in North Warwickshire, generating since 1 December 2005. Planning permission was granted on 1 July 2002, 3 months after submission. Operator of record: Energy Developments (UK) / SITA UK.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2005
Landfill Gas
Technology
Energy Developments (UK) / SITA UK
North Warwickshire
Authority
England

Planning and build timeline

Application submitted21 March 2002
Permission granted1 July 2002
3 months after submission
Operational1 December 2005
41 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Warwickshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Packington Generation Plant Phase 3’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
2.45.7 km
Solar Photovoltaics · Operational
57 km
Battery · Under Construction
4007.5 km
Sewage Sludge Digestion · Operational
9.78.1 km
EfW Incineration · Operational
3010.2 km
Advanced Conversion Technologies · Operational
10.310.3 km
Battery · Under Construction
20010.3 km
Anaerobic Digestion · Operational
213.3 km

How big is Packington Generation Plant Phase 3?

Packington Generation Plant Phase 3 has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Packington Generation Plant Phase 3?

REPD records the operator as Energy Developments (UK) / SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Packington Generation Plant Phase 3 approved and built?

The application was submitted on 21 March 2002. Permission was granted on 1 July 2002, 3 months later. The site became operational on 1 December 2005, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 559.