Packington Generation Plant Phase 3

Packington Generation Plant Phase 3 is operational in North Warwickshire with a recorded capacity of 8.5 MW, and has been generating since 2005-12-01.

8.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-12-01
Landfill Gas
Technology
Energy Developments (UK) / SITA UK
North Warwickshire
Authority
England

Planning and build timeline

Application submitted2002-03-21
Permission granted2002-07-01
3 months after submission
Operational2005-12-01
41 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Coleshill STW (Waste AD)
Anaerobic Digestion · Operational
2.45.7 km
Land South of Pogmore Spinney
Solar Photovoltaics · Operational
57 km
Hams Hall - Battery Energy Storage System
Battery · Under Construction
4007.5 km
Minsworth Sewage Treatment Works
Sewage Sludge Digestion · Operational
9.78.1 km
Tyseley ERF
EfW Incineration · Operational
3010.2 km
Birmingham Bio-Power Plant
Advanced Conversion Technologies · Operational
10.310.3 km
Little Beanit Farm, Balsall Common - Battery Storage
Battery · Under Construction
20010.3 km
Merevale & Blyth Estate (Waste AD)
Anaerobic Digestion · Operational
213.3 km

How big is Packington Generation Plant Phase 3?

Packington Generation Plant Phase 3 has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Packington Generation Plant Phase 3?

REPD records the operator as Energy Developments (UK) / SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Packington Generation Plant Phase 3 approved and built?

The application was submitted on 2002-03-21. Permission was granted on 2002-07-01, 3 months later. The site became operational on 2005-12-01, 41 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 559.