Ranson Moor Wind Farm (Phase 2)

Ranson Moor Wind Farm (Phase 2) is operational in Fenland with a recorded capacity of 4 MW, and has been generating since 2007-05-01.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2007-05-01
Wind Onshore
Technology
EcoGen Projects / Fenpower
Fenland
Authority
England

Planning and build timeline

Application submitted2006-05-18
Permission granted2007-02-23
9 months after submission
Operational2007-05-01
2 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on onshore wind

Fenland has decided 20 onshore wind schemes and approved 85%, taking a median of 12.8 months. See every onshore wind scheme decision in Fenland

Other built sites within 15 km

SiteMWDistance
Ranson Moor (phase 1)
Wind Onshore · Operational
60.5 km
Asksham Community Village Solar Farm
Solar Photovoltaics · Under Construction
0.151.3 km
Greenvale AP Wind Turbine
Wind Onshore · Operational
1.53.1 km
Boardinghouse Wind Farm
Wind Onshore · Operational
10.33.1 km
Turves/Burtnhouse Solar Farm Extension
Solar Photovoltaics · Operational
4.74.8 km
Turves Solar Farm
Solar Photovoltaics · Operational
54.8 km
Burnt House Farm
Wind Onshore · Operational
65.7 km
Land East Of Honeysome Road
Solar Photovoltaics · Operational
4.66 km

How big is Ranson Moor Wind Farm (Phase 2)?

Ranson Moor Wind Farm (Phase 2) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ranson Moor Wind Farm (Phase 2)?

REPD records the operator as EcoGen Projects / Fenpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ranson Moor Wind Farm (Phase 2) approved and built?

The application was submitted on 2006-05-18. Permission was granted on 2007-02-23, 9 months later. The site became operational on 2007-05-01, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2953.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council