Renewable sites › Tummel Bridge Power Station - Hydro Plant
Tummel Bridge Power Station - Hydro Plant
Tummel Bridge Power Station - Hydro Plant is an operational 40 MW hydro scheme in Perth and Kinross, generating since 1 May 2024. REPD does not record the planning grant date. Operator of record: Scottish & Southern Energy Scottish Hydro Electric.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1 May 2024 |
Screening a site of your own?
Redline runs the record on your own boundary in Perth and Kinross: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Tummel Bridge Power Station - Hydro Plant’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Small Hydro · Operational | 2 | 10.4 km |
Wind Onshore · Operational | 32.2 | 12.5 km |
Solar Photovoltaics · Operational | 0.16 | 12.8 km |
Small Hydro · Operational | 1.4 | 13.2 km |
Small Hydro · Operational | 1.1 | 14.1 km |
Small Hydro · Operational | 1.2 | 14.7 km |
How big is Tummel Bridge Power Station - Hydro Plant?
Tummel Bridge Power Station - Hydro Plant has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Tummel Bridge Power Station - Hydro Plant?
REPD records the operator as Scottish & Southern Energy Scottish Hydro Electric. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Tummel Bridge Power Station - Hydro Plant approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 May 2024.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10995.