Novarly ParcelRenewable sites

Renewable sitesTummel Bridge Power Station - Hydro Plant

Tummel Bridge Power Station - Hydro Plant

Tummel Bridge Power Station - Hydro Plant is an operational 40 MW hydro scheme in Perth and Kinross, generating since 1 May 2024. REPD does not record the planning grant date. Operator of record: Scottish & Southern Energy Scottish Hydro Electric.

40 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2024
Large Hydro
Technology
Scottish & Southern Energy Scottish Hydro Electric
Perth and Kinross
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 May 2024

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Perth and Kinross: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Tummel Bridge Power Station - Hydro Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
210.4 km
Wind Onshore · Operational
32.212.5 km
Solar Photovoltaics · Operational
0.1612.8 km
Small Hydro · Operational
1.413.2 km
Small Hydro · Operational
1.114.1 km
Small Hydro · Operational
1.214.7 km

How big is Tummel Bridge Power Station - Hydro Plant?

Tummel Bridge Power Station - Hydro Plant has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tummel Bridge Power Station - Hydro Plant?

REPD records the operator as Scottish & Southern Energy Scottish Hydro Electric. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tummel Bridge Power Station - Hydro Plant approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 May 2024.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10995.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode