Novarly ParcelRenewable sites

Renewable sitesBlair Castle Caravan Park, Blair Atholl - Solar Farm

Blair Castle Caravan Park, Blair Atholl - Solar Farm

Blair Castle Caravan Park, Blair Atholl - Solar Farm is an operational 0.16 MW solar farm in Perth and Kinross, generating since 1 May 2023. Planning permission was granted on 25 July 2023, 1 months after submission. Operator of record: Atholl Estates.

0.16 MW
Capacity
as recorded in REPD
Operational
Status
since 1 May 2023
Solar Photovoltaics
Technology
Atholl Estates
Perth and Kinross
Authority
Scotland

Planning and build timeline

Application submitted12 June 2023
Permission granted25 July 2023
1 months after submission
Operational1 May 2023

Screening a site of your own?

RedlineUK · £39

Perth and Kinross approves 82% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Blair Castle Caravan Park, Blair Atholl - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Perth and Kinross’s record on solar

Perth and Kinross has decided 22 solar farms and approved 82%, taking a median of 3.3 months. See every solar farm decision in Perth and Kinross

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
1.98.8 km
Large Hydro · Operational
1510 km
Large Hydro · Operational
4012.8 km
Small Hydro · Operational
1.113.9 km

How big is Blair Castle Caravan Park, Blair Atholl - Solar Farm?

Blair Castle Caravan Park, Blair Atholl - Solar Farm has a recorded installed capacity of 0.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blair Castle Caravan Park, Blair Atholl - Solar Farm?

REPD records the operator as Atholl Estates. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blair Castle Caravan Park, Blair Atholl - Solar Farm approved and built?

The application was submitted on 12 June 2023. Permission was granted on 25 July 2023, 1 months later. The site became operational on 1 May 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14202.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode