Renewable sites › Blair Castle Caravan Park, Blair Atholl - Solar Farm
Blair Castle Caravan Park, Blair Atholl - Solar Farm
Blair Castle Caravan Park, Blair Atholl - Solar Farm is operational in Perth and Kinross with a recorded capacity of 0.16 MW, and has been generating since 2023-05-01.
Planning and build timeline
| Application submitted | 2023-06-12 |
| Permission granted | 2023-07-25 1 months after submission |
| Operational | 2023-05-01 |
Perth and Kinross’s record on solar
Perth and Kinross has decided 22 solar farms and approved 82%, taking a median of 3.3 months. See every solar farm decision in Perth and Kinross →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bruar Hydro Scheme Small Hydro · Operational | 1.9 | 8.8 km |
Pitlochry Large Hydro · Operational | 15 | 10 km |
Tummel Bridge Power Station - Hydro Plant Large Hydro · Operational | 40 | 12.8 km |
Beinn Eagagach Hydro Small Hydro · Operational | 1.1 | 13.9 km |
How big is Blair Castle Caravan Park, Blair Atholl - Solar Farm?
Blair Castle Caravan Park, Blair Atholl - Solar Farm has a recorded installed capacity of 0.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Blair Castle Caravan Park, Blair Atholl - Solar Farm?
REPD records the operator as Atholl Estates. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Blair Castle Caravan Park, Blair Atholl - Solar Farm approved and built?
The application was submitted on 2023-06-12. Permission was granted on 2023-07-25, 1 months later. The site became operational on 2023-05-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14202.