Renewable sites › Innerhadden Burn Hydro
Innerhadden Burn Hydro
Innerhadden Burn Hydro is operational in Perth and Kinross with a recorded capacity of 1.4 MW, and has been generating since 2011-02-01.
Planning and build timeline
| Application submitted | 2005-12-06 |
| Permission granted | 2008-04-01 28 months after submission |
| Operational | 2011-02-01 34 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Invervar Hydro Small Hydro · Operational | 1.2 | 2.8 km |
Innerwick Hydro Small Hydro · Operational | 1 | 8 km |
Keltneyburn Hydro Small Hydro · Operational | 2 | 11.4 km |
Ardtalnaig Hydro Scheme Small Hydro · Operational | 2 | 12.1 km |
Tummel Bridge Power Station - Hydro Plant Large Hydro · Operational | 40 | 13.2 km |
How big is Innerhadden Burn Hydro?
Innerhadden Burn Hydro has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Innerhadden Burn Hydro?
REPD records the operator as Innerhadden Hydro. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Innerhadden Burn Hydro approved and built?
The application was submitted on 2005-12-06. Permission was granted on 2008-04-01, 28 months later. The site became operational on 2011-02-01, 34 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 429.