Renewable sites › Invervar Hydro
Invervar Hydro
Invervar Hydro is operational in Perth and Kinross with a recorded capacity of 1.2 MW, and has been generating since 2015-11-15.
Planning and build timeline
| Application submitted | 2012-02-14 |
| Permission granted | 2012-04-24 2 months after submission |
| Operational | 2015-11-15 43 months after consent |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Innerhadden Burn Hydro Small Hydro · Operational | 1.4 | 2.8 km |
Innerwick Hydro Small Hydro · Operational | 1 | 7.9 km |
Ardtalnaig Hydro Scheme Small Hydro · Operational | 2 | 9.4 km |
Keltneyburn Hydro Small Hydro · Operational | 2 | 10.7 km |
Tummel Bridge Power Station - Hydro Plant Large Hydro · Operational | 40 | 14.7 km |
How big is Invervar Hydro?
Invervar Hydro has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Invervar Hydro?
REPD records the operator as Green Highland Renewables (on behalf of North Chesthill Estate). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Invervar Hydro approved and built?
The application was submitted on 2012-02-14. Permission was granted on 2012-04-24, 2 months later. The site became operational on 2015-11-15, 43 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 477.