Renewable sitesBootham Lane

Bootham Lane

Bootham Lane is operational in Doncaster with a recorded capacity of 1.2 MW, and has been generating since 2002-10-01.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-10-01
Landfill Gas
Technology
Waste Recycling Group
Doncaster
Authority
England

Planning and build timeline

Application submitted2000-01-28
Permission granted2000-05-19
4 months after submission
Operational2002-10-01
28 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bootham Lane Phase 2
Landfill Gas · Operational
1.40 km
Bootham Lane Landfill
Landfill Gas · Operational
2.70.4 km
Tudworth Field Road, Hatfield - Solar Panels
Solar Photovoltaics · Under Construction
0.183.1 km
Tudworth Field Road, Hatfield - Solar PV Panels
Solar Photovoltaics · Operational
0.273.1 km
Trackwork Limited (EfW)
EfW Incineration · Operational
33.9 km
Ikea Distribution Centre
Solar Photovoltaics · Operational
1.75.2 km
Next Distribution Centre Doncaster
Solar Photovoltaics · Operational
2.55.6 km
Tween Bridge Windfarm
Wind Onshore · Operational
446.4 km

How big is Bootham Lane?

Bootham Lane has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bootham Lane?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bootham Lane approved and built?

The application was submitted on 2000-01-28. Permission was granted on 2000-05-19, 4 months later. The site became operational on 2002-10-01, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 614.