Troughton Farm

Troughton Farm is operational in Tewkesbury with a recorded capacity of 30 MW, and has been generating since 2016-03-23.

30 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-23
Solar Photovoltaics
Technology
Hive Energy
Tewkesbury
Authority
England

Planning and build timeline

Application submitted2013-02-11
Permission granted2014-07-22
17 months after submission
Operational2016-03-23
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tewkesbury’s record on solar

Tewkesbury has decided 24 solar farms and approved 92%, taking a median of 5.5 months. See every solar farm decision in Tewkesbury

Other built sites within 15 km

SiteMWDistance
Wingmoor Farm (Waste AD)
Anaerobic Digestion · Operational
1.63 km
Home Farm
Solar Photovoltaics · Operational
6.73.4 km
Moog Controls Factory
Solar Photovoltaics · Operational
0.384.5 km
Safran Landing Systems Service
Biomass (dedicated) · Operational
3.67.7 km
Meteor Business Park
Battery · Operational
1.57.8 km
Lower Stanley Farm
Solar Photovoltaics · Operational
48.8 km
Glebe Farm Solar Farm
Solar Photovoltaics · Operational
3212.4 km
Lower Strensham, Bourne Road (Extension)
Solar Photovoltaics · Operational
812.7 km

How big is Troughton Farm?

Troughton Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Troughton Farm?

REPD records the operator as Hive Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Troughton Farm approved and built?

The application was submitted on 2013-02-11. Permission was granted on 2014-07-22, 17 months later. The site became operational on 2016-03-23, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2080.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council