Meteor Business Park is an operational 1.5 MW battery storage site in Tewkesbury, generating since 16 January 2020. REPD does not record the planning grant date. Operator of record: Safran Landing Systems.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 16 January 2020
Battery
Technology
Safran Landing Systems
Tewkesbury
Authority
England

Planning and build timeline

Application submitted21 February 2019
Permission grantednot recorded
Operational16 January 2020

Screening a site of your own?

RedlineUK · £39

Tewkesbury approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Meteor Business Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tewkesbury’s record on battery storage

Tewkesbury has decided 5 battery storage schemes and approved 100%, taking a median of 7.4 months. See every battery storage scheme decision in Tewkesbury

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
3.60.1 km
Solar Photovoltaics · Under Construction
15.7 km
Solar Photovoltaics · Operational
6.77.1 km
Solar Photovoltaics · Operational
307.8 km
Anaerobic Digestion · Operational
1.68.2 km
Solar Photovoltaics · Operational
10.2 km
Battery · Operational
12 km
Solar Photovoltaics · Operational
49.912 km

How big is Meteor Business Park?

Meteor Business Park has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Meteor Business Park?

REPD records the operator as Safran Landing Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Meteor Business Park approved and built?

The application was submitted on 21 February 2019. REPD does not record a grant date. The site became operational on 16 January 2020.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7242.