Novarly ParcelRenewable sites

Renewable sitesHome Farm

Home Farm

Home Farm is an operational 6.7 MW solar farm in Tewkesbury, generating since 31 March 2017. Planning permission was granted on 22 October 2015, 8 months after submission. Operator of record: Wirsol Energy.

6.7 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
Wirsol Energy
Tewkesbury
Authority
England

Planning and build timeline

Application submitted3 March 2015
Permission granted22 October 2015
8 months after submission
Operational31 March 2017
17 months after consent

Screening a site of your own?

RedlineUK · £39

Tewkesbury approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Home Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tewkesbury’s record on solar

Tewkesbury has decided 24 solar farms and approved 92%, taking a median of 5.5 months. See every solar farm decision in Tewkesbury

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.61.3 km
Solar Photovoltaics · Operational
303.4 km
Biomass (dedicated) · Operational
3.67 km
Battery · Operational
1.57.1 km
Solar Photovoltaics · Operational
0.387.2 km
Solar Photovoltaics · Operational
48 km
Solar Photovoltaics · Under Construction
111.4 km

How big is Home Farm?

Home Farm has a recorded installed capacity of 6.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Home Farm?

REPD records the operator as Wirsol Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Home Farm approved and built?

The application was submitted on 3 March 2015. Permission was granted on 22 October 2015, 8 months later. The site became operational on 31 March 2017, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5090.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode