Trimdon Grange

Trimdon Grange is operational in County Durham with a recorded capacity of 5.2 MW, and has been generating since 2008-07-10.

5.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2008-07-10
Wind Onshore
Technology
Cumbria Wind Farms
County Durham
Authority
England

Planning and build timeline

Application submitted2005-07-01
Permission grantednot recorded
Operational2008-07-10

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
Southern Law
Wind Onshore · Operational
5.20.5 km
PG1-Coxhoe Waste Disposal Site
Landfill Gas · Operational
3.83.2 km
Hare Hill
Wind Onshore · Operational
1.34.9 km
Hare Hill (B)
Wind Onshore · Operational
2.74.9 km
Haswell Moor
Wind Onshore · Operational
105.5 km
Butterwick Moor
Wind Onshore · Operational
20.57 km
Walkway
Wind Onshore · Operational
147 km
High Haswell Wind Farm
Wind Onshore · Operational
47.5 km

How big is Trimdon Grange?

Trimdon Grange has a recorded installed capacity of 5.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Trimdon Grange?

REPD records the operator as Cumbria Wind Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Trimdon Grange approved and built?

The application was submitted on 2005-07-01. REPD does not record a grant date. The site became operational on 2008-07-10.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4690.