Novarly ParcelRenewable sites

Renewable sitesHare Hill (B)

Hare Hill (B)

Hare Hill (B) is operational in County Durham with a recorded capacity of 2.7 MW, and has been generating since 2004-07-02.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-07-02
Wind Onshore
Technology
Powergen
County Durham
Authority
England

Planning and build timeline

Application submitted1994-04-01
Permission granted1997-03-01
35 months after submission
Operational2004-07-02
88 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
Hare Hill
Wind Onshore · Operational
1.30 km
Haswell Moor
Wind Onshore · Operational
100.6 km
High Haswell Wind Farm
Wind Onshore · Operational
43.1 km
B H K UK Davy Drive - Solar Panels
Solar Photovoltaics · Under Construction
1.343.5 km
Peterlee Solar Farm
Solar Photovoltaics · Operational
53.5 km
Southern Law
Wind Onshore · Operational
5.24.6 km
Hawthorn Grid Site - Battery Storage
Battery · Operational
494.6 km
Trimdon Grange
Wind Onshore · Operational
5.24.9 km

How big is Hare Hill (B)?

Hare Hill (B) has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hare Hill (B)?

REPD records the operator as Powergen. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hare Hill (B) approved and built?

The application was submitted on 1994-04-01. Permission was granted on 1997-03-01, 35 months later. The site became operational on 2004-07-02, 88 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3110.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council