Novarly ParcelRenewable sites

Renewable sitesTorrdhuin, Auchteraw Battery Storage Facility

Torrdhuin, Auchteraw Battery Storage Facility

Torrdhuin, Auchteraw Battery Storage Facility is an operational 49.9 MW battery storage site in Highland, generating since 22 August 2025. Planning permission was granted on 9 March 2021, 4 months after submission. Operator of record: Field Energy.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
since 22 August 2025
Battery
Technology
Field Energy
Highland
Authority
Scotland

Planning and build timeline

Application submitted18 November 2020
Permission granted9 March 2021
4 months after submission
Operational22 August 2025
53 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 85% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Torrdhuin, Auchteraw Battery Storage Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on battery storage

Highland has decided 34 battery storage schemes and approved 85%, taking a median of 12.6 months. See every battery storage scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Large Hydro · Operational
1004.6 km
Large Hydro · Operational
206.9 km
Large Hydro · Operational
368 km
Wind Onshore · Operational
159.6 km
Wind Onshore · Operational
409.6 km
Wind Onshore · Operational
109.9 km
Large Hydro · Operational
1511.3 km
Small Hydro · Under Construction
0.511.4 km

How big is Torrdhuin, Auchteraw Battery Storage Facility?

Torrdhuin, Auchteraw Battery Storage Facility has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Torrdhuin, Auchteraw Battery Storage Facility?

REPD records the operator as Field Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Torrdhuin, Auchteraw Battery Storage Facility approved and built?

The application was submitted on 18 November 2020. Permission was granted on 9 March 2021, 4 months later. The site became operational on 22 August 2025, 53 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8096.