Allt an t-Sidhein Hydro Scheme
Allt an t-Sidhein Hydro Scheme is a 0.5 MW hydro scheme under construction in Highland. Planning permission was granted on 8 October 2019, 10 months after submission. Operator of record: Vento Ludens.
Planning and build timeline
| Application submitted | 18 December 2018 |
| Permission granted | 8 October 2019 10 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Highland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Allt an t-Sidhein Hydro Scheme’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Large Hydro · Operational | 20 | 4.5 km |
Small Hydro · Operational | 1.3 | 7.5 km |
Battery · Operational | 49.9 | 11.4 km |
Wind Onshore · Operational | 23.8 | 11.6 km |
Wind Onshore · Operational | 85 | 11.6 km |
Wind Onshore · Operational | 10 | 13.7 km |
Wind Onshore · Operational | 40 | 14.1 km |
Wind Onshore · Operational | 15 | 14.1 km |
How big is Allt an t-Sidhein Hydro Scheme?
Allt an t-Sidhein Hydro Scheme has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Allt an t-Sidhein Hydro Scheme?
REPD records the operator as Vento Ludens. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Allt an t-Sidhein Hydro Scheme approved and built?
The application was submitted on 18 December 2018. Permission was granted on 8 October 2019, 10 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7328.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode