Glendoe Hydro Scheme

Glendoe Hydro Scheme is an operational 100 MW hydro scheme in Scotland, generating since 1 December 2008. Planning permission was granted on 28 July 2005, 27 months after submission. Operator of record: Scottish and Southern Energy (SSE).

100 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2008
Large Hydro
Technology
Scottish and Southern Energy (SSE)
National
Authority
Scotland

Planning and build timeline

Application submitted1 May 2003
Permission granted28 July 2005
27 months after submission
Operational1 December 2008
40 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glendoe Hydro Scheme’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.94.6 km
Large Hydro · Operational
367.5 km
Wind Onshore · Operational
227.78.3 km
Large Hydro · Operational
158.6 km
Wind Onshore · Operational
1109.6 km
Large Hydro · Operational
2010.6 km
Small Hydro · Operational
211.7 km
Wind Onshore · Operational
1513.6 km

How big is Glendoe Hydro Scheme?

Glendoe Hydro Scheme has a recorded installed capacity of 100 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glendoe Hydro Scheme?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glendoe Hydro Scheme approved and built?

The application was submitted on 1 May 2003. Permission was granted on 28 July 2005, 27 months later. The site became operational on 1 December 2008, 40 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 388.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode