Novarly ParcelRenewable sites

Renewable sitesBarvills Solar Farm

Barvills Solar Farm

Barvills Solar Farm is operational in Thurrock with a recorded capacity of 5 MW, and has been generating since 2017-03-29.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-29
Solar Photovoltaics
Technology
BE Renewables/Barvills Solar Limited
Thurrock
Authority
England

Planning and build timeline

Application submitted2015-03-19
Permission granted2015-08-07
5 months after submission
Operational2017-03-29
20 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Thurrock’s record on solar

Thurrock has decided 17 solar farms and approved 94%, taking a median of 2.4 months. See every solar farm decision in Thurrock

Other built sites within 15 km

SiteMWDistance
Mucking Gas 3 Landfill Scheme
Landfill Gas · Operational
3.92.4 km
Mucking Gas 2 Landfill Scheme
Landfill Gas · Operational
3.82.4 km
Thurrock Flexible Generation Plant
Battery · Operational
1503.2 km
London Distribution Park
Battery · Operational
3.84.9 km
Tilbury LCY2
Solar Photovoltaics · Operational
44.9 km
Tilbury Green Power
Biomass (dedicated) · Operational
435.3 km
Tilbury Docks
Wind Onshore · Operational
126.2 km
Ockendon 'B' Landfill Scheme
Landfill Gas · Operational
4.59.1 km

How big is Barvills Solar Farm?

Barvills Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Barvills Solar Farm?

REPD records the operator as BE Renewables/Barvills Solar Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Barvills Solar Farm approved and built?

The application was submitted on 2015-03-19. Permission was granted on 2015-08-07, 5 months later. The site became operational on 2017-03-29, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5942.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council