Novarly ParcelRenewable sites

Renewable sitesThe Old Airfield

The Old Airfield

The Old Airfield is operational in Broadland with a recorded capacity of 5 MW, and has been generating since 2015-03-31.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Lumicity
Broadland
Authority
England

Planning and build timeline

Application submitted2013-12-03
Permission granted2014-03-04
3 months after submission
Operational2015-03-31
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Broadland’s record on solar

Broadland has decided 15 solar farms and approved 93%, taking a median of 3.3 months. See every solar farm decision in Broadland

Other built sites within 15 km

SiteMWDistance
Weston Airfield Wind Turbines
Wind Onshore · Operational
3.60.9 km
Woodforde Farm
Solar Photovoltaics · Operational
91.2 km
Colton - Solar photovoltaic farm, Battery storage
Battery · Under Construction
305.1 km
Colton - Solar photovoltaic farm, Battery storage
Solar Photovoltaics · Under Construction
305.1 km
Attlebridge Landfill Site
Landfill Gas · Operational
1.35.1 km
Spring Farm (biomass)
Anaerobic Digestion · Operational
16.2 km
Reepham Road (Waste AD)
Anaerobic Digestion · Operational
1.56.8 km
Costessey Landfill Gas Project 2
Landfill Gas · Operational
27.6 km

How big is The Old Airfield?

The Old Airfield has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates The Old Airfield?

REPD records the operator as Lumicity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was The Old Airfield approved and built?

The application was submitted on 2013-12-03. Permission was granted on 2014-03-04, 3 months later. The site became operational on 2015-03-31, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2072.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council