The Michelin Tyre Factory - Ballymena
The Michelin Tyre Factory - Ballymena is an operational 4.6 MW onshore wind farm in Mid and East Antrim, generating since 25 February 2013. Planning permission was granted on 7 February 2010, 7 months after submission. Operator of record: Ecotricity.
Planning and build timeline
| Application submitted | 24 July 2009 |
| Permission granted | 7 February 2010 7 months after submission |
| Operational | 25 February 2013 37 months after consent |
Screening a site of your own?
Mid and East Antrim approves 81% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with The Michelin Tyre Factory - Ballymena’s recorded coordinate — swap in your own postcode or coordinates.
Mid and East Antrim’s record on onshore wind
Mid and East Antrim has decided 21 onshore wind schemes and approved 81%, taking a median of 14.6 months. See every onshore wind scheme decision in Mid and East Antrim →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 4.7 | 2.3 km |
Solar Photovoltaics · Operational | 13 | 3.7 km |
Anaerobic Digestion · Operational | 3 | 4 km |
Wind Onshore · Operational | 22 | 6.7 km |
Wind Onshore · Operational | 21 | 8.9 km |
Wind Onshore · Operational | 5 | 9.3 km |
Wind Onshore · Operational | 8.8 | 10.8 km |
Wind Onshore · Operational | 1.7 | 13.8 km |
How big is The Michelin Tyre Factory - Ballymena?
The Michelin Tyre Factory - Ballymena has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates The Michelin Tyre Factory - Ballymena?
REPD records the operator as Ecotricity. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was The Michelin Tyre Factory - Ballymena approved and built?
The application was submitted on 24 July 2009. Permission was granted on 7 February 2010, 7 months later. The site became operational on 25 February 2013, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3680.