Ballymena Wind Park Limited
Ballymena Wind Park Limited is an operational 4.7 MW onshore wind farm in Mid and East Antrim, generating since 24 January 2013. Planning permission was granted on 14 April 2010, 9 months after submission. Operator of record: White Young Green Planning.
Planning and build timeline
| Application submitted | 24 July 2009 |
| Permission granted | 14 April 2010 9 months after submission |
| Operational | 24 January 2013 33 months after consent |
Screening a site of your own?
Mid and East Antrim approves 81% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ballymena Wind Park Limited’s recorded coordinate — swap in your own postcode or coordinates.
Mid and East Antrim’s record on onshore wind
Mid and East Antrim has decided 21 onshore wind schemes and approved 81%, taking a median of 14.6 months. See every onshore wind scheme decision in Mid and East Antrim →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 13 | 1.4 km |
Wind Onshore · Operational | 4.6 | 2.3 km |
Anaerobic Digestion · Operational | 3 | 5.2 km |
Wind Onshore · Operational | 22 | 6.5 km |
Wind Onshore · Operational | 21 | 8.8 km |
Wind Onshore · Operational | 5 | 10.6 km |
Wind Onshore · Operational | 8.8 | 12.9 km |
Wind Onshore · Operational | 1.7 | 13.5 km |
How big is Ballymena Wind Park Limited?
Ballymena Wind Park Limited has a recorded installed capacity of 4.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ballymena Wind Park Limited?
REPD records the operator as White Young Green Planning. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ballymena Wind Park Limited approved and built?
The application was submitted on 24 July 2009. Permission was granted on 14 April 2010, 9 months later. The site became operational on 24 January 2013, 33 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2866.