Connaught Road
Connaught Road is operational in Antrim and Newtownabbey with a recorded capacity of 1.7 MW, and has been generating since 2012-10-11.
Planning and build timeline
| Application submitted | 2008-06-02 |
| Permission granted | 2012-03-01 45 months after submission |
| Operational | 2012-10-11 7 months after consent |
Antrim and Newtownabbey’s record on onshore wind
Antrim and Newtownabbey has decided 19 onshore wind schemes and approved 79%, taking a median of 20.4 months. See every onshore wind scheme decision in Antrim and Newtownabbey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Millar Farm Solar Photovoltaics · Operational | 6 | 5.2 km |
Corby Knowe Wind Onshore · Operational | 5 | 8.7 km |
South Antrim Solar Park - Phase 1 Solar Photovoltaics · Operational | 6.5 | 9.3 km |
Tully Quarry Anaerobic Digestion · Operational | 3 | 10.5 km |
Elliot's Hill Wind Farm Wind Onshore · Operational | 5 | 12.5 km |
Crookedstone Road Solar Photovoltaics · Operational | 4.8 | 12.7 km |
Ballymena Wind Park Limited Wind Onshore · Operational | 4.7 | 13.5 km |
Ballygarvey Road Solar Photovoltaics · Operational | 13 | 13.6 km |
How big is Connaught Road?
Connaught Road has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Connaught Road?
REPD records the operator as Lowlands Health & Energy Ltd�. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Connaught Road approved and built?
The application was submitted on 2008-06-02. Permission was granted on 2012-03-01, 45 months later. The site became operational on 2012-10-11, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3716.