Renewable sitesTesco Extra Altrincham

Tesco Extra Altrincham

Tesco Extra Altrincham is under construction in Trafford with a recorded capacity of 0.5 MW.

0.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Tesco Stores / Kingspan Energy
Trafford
Authority
England

Planning and build timeline

Application submitted2020-07-22
Permission granted2020-09-11
2 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Trafford’s record on solar

Trafford has decided 17 solar farms and approved 82%, taking a median of 1.8 months. See every solar farm decision in Trafford

Other built sites within 15 km

SiteMWDistance
Freshfields, Fairy Lane - Battery Storage
Battery · Under Construction
99.95.8 km
West Didsbury Battery Storage
Battery · Operational
49.995.8 km
SAICA Paper Mill
Biomass (dedicated) · Operational
41.66.5 km
South Manchester Resource Recovery Centre (AD)
Anaerobic Digestion · Operational
26.8 km
Butchersfield Landfill Site
Landfill Gas · Operational
39.2 km
Turnpike Depot - Solar Panels
Solar Photovoltaics · Under Construction
0.4811 km
Audi Stockport, Brinksway, Edgeley - Solar Panels
Solar Photovoltaics · Operational
0.2711.8 km
Royal Northern College Of Music, Oxford Road - Solar Photovoltaic panels
Solar Photovoltaics · Under Construction
0.1711.8 km

How big is Tesco Extra Altrincham?

Tesco Extra Altrincham has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Tesco Extra Altrincham?

REPD records the operator as Tesco Stores / Kingspan Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Tesco Extra Altrincham approved and built?

The application was submitted on 2020-07-22. Permission was granted on 2020-09-11, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8029.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council