Renewable sites › Turnpike Depot - Solar Panels
Turnpike Depot - Solar Panels
Turnpike Depot - Solar Panels is under construction in Salford with a recorded capacity of 0.48 MW.
Planning and build timeline
| Application submitted | 2023-05-12 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Salford’s record on solar
Salford has decided 9 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Salford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Salford Refuse Treatment Plant (AD) Anaerobic Digestion · Operational | 2 | 2.3 km |
Clifton Hall Landfill Gas · Operational | 1 | 4.3 km |
Royal Northern College Of Music, Oxford Road - Solar Photovoltaic panels Solar Photovoltaics · Under Construction | 0.17 | 5.4 km |
Bent Spur Solar Farm Solar Photovoltaics · Operational | 5 | 7 km |
Ardwick Railway Goods Yard Incinerator (Newhaven EFW Plant) EfW Incineration · Operational | 33.5 | 7.1 km |
Freshfields, Fairy Lane - Battery Storage Battery · Under Construction | 99.9 | 7.3 km |
West Didsbury Battery Storage Battery · Operational | 49.99 | 7.4 km |
Moston Vale Battery · Under Construction | 10 | 7.6 km |
How big is Turnpike Depot - Solar Panels?
Turnpike Depot - Solar Panels has a recorded installed capacity of 0.48 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Turnpike Depot - Solar Panels?
REPD records the operator as Salford City Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Turnpike Depot - Solar Panels approved and built?
The application was submitted on 2023-05-12. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13973.
Novarly Parcel · official public data, read properly · parcel.novarly.com