Renewable sitesFreshfields, Fairy Lane - Battery Storage

Freshfields, Fairy Lane - Battery Storage

Freshfields, Fairy Lane - Battery Storage is a 99.9 MW battery storage site under construction in Trafford. Planning permission was granted on 20 March 2023, 5 months after submission. Operator of record: STOR Power Utilities Limited.

99.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
STOR Power Utilities Limited
Trafford
Authority
England

Planning and build timeline

Application submitted25 October 2022
Permission granted20 March 2023
5 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Trafford approves 89% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Freshfields, Fairy Lane - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Trafford’s record on battery storage

Trafford has decided 9 battery storage schemes and approved 89%, taking a median of 7.4 months. See every battery storage scheme decision in Trafford

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.990.1 km
Anaerobic Digestion · Operational
23.7 km
Solar Photovoltaics · Under Construction
0.55.8 km
Solar Photovoltaics · Under Construction
0.176.2 km
Solar Photovoltaics · Under Construction
0.487.3 km
Solar Photovoltaics · Operational
0.277.4 km
Solar Photovoltaics · Operational
0.67.8 km
EfW Incineration · Operational
33.57.8 km

How big is Freshfields, Fairy Lane - Battery Storage?

Freshfields, Fairy Lane - Battery Storage has a recorded installed capacity of 99.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Freshfields, Fairy Lane - Battery Storage?

REPD records the operator as STOR Power Utilities Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Freshfields, Fairy Lane - Battery Storage approved and built?

The application was submitted on 25 October 2022. Permission was granted on 20 March 2023, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12694.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode