Renewable sites › Summercourt Solar Farm (Glebe Farm)
Summercourt Solar Farm (Glebe Farm)
Summercourt Solar Farm (Glebe Farm) is operational in Cornwall with a recorded capacity of 1.1 MW, and has been generating since 2013-03-30.
Planning and build timeline
| Application submitted | 2012-06-26 |
| Permission granted | 2012-10-31 4 months after submission |
| Operational | 2013-03-30 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land North East Of Penrose Far Solar Photovoltaics · Operational | 1.5 | 0.4 km |
Trefullock Solar Farm Solar Photovoltaics · Operational | 5 | 0.8 km |
Burthy Farm Solar Photovoltaics · Operational | 10 | 1.6 km |
Goonabarn Farm Wind Turbines Wind Onshore · Operational | 1 | 2.6 km |
Hewas Solar Farm Solar Photovoltaics · Operational | 5 | 4.1 km |
KERNICK MICA DAM - SOLAR FARM Solar Photovoltaics · Operational | 12 | 4.4 km |
Trethosa Farm Solar Park Solar Photovoltaics · Operational | 4.8 | 4.6 km |
Cornwall ERC EfW Incineration · Operational | 20 | 4.9 km |
How big is Summercourt Solar Farm (Glebe Farm)?
Summercourt Solar Farm (Glebe Farm) has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Summercourt Solar Farm (Glebe Farm)?
REPD records the operator as Solar Securities Group Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Summercourt Solar Farm (Glebe Farm) approved and built?
The application was submitted on 2012-06-26. Permission was granted on 2012-10-31, 4 months later. The site became operational on 2013-03-30, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1065.
Novarly Parcel · official public data, read properly · parcel.novarly.com