Stronelairg Wind Farm

Stronelairg Wind Farm is an operational 227.7 MW onshore wind farm in Scotland, generating since 11 December 2018. Planning permission was granted on 6 June 2014, 23 months after submission. Operator of record: Scottish and Southern Energy (SSE).

227.7 MW
Capacity
as recorded in REPD
Operational
Status
since 11 December 2018
Wind Onshore
Technology
Scottish and Southern Energy (SSE)
National
Authority
Scotland

Planning and build timeline

Application submitted29 June 2012
Permission granted6 June 2014
23 months after submission
Operational11 December 2018
54 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stronelairg Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
27.1 km
Large Hydro · Operational
1008.3 km
Small Hydro · Operational
310.7 km
Wind Onshore · Operational
11010.8 km
Wind Onshore · Operational
69.512.3 km
Battery · Operational
49.912.4 km
Large Hydro · Operational
1512.7 km
Large Hydro · Operational
5.213.4 km

How big is Stronelairg Wind Farm?

Stronelairg Wind Farm has a recorded installed capacity of 227.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stronelairg Wind Farm?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stronelairg Wind Farm approved and built?

The application was submitted on 29 June 2012. Permission was granted on 6 June 2014, 23 months later. The site became operational on 11 December 2018, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4597.