Renewable sites › Stronelairg Wind Farm
Stronelairg Wind Farm
Stronelairg Wind Farm is operational in Scottish Government (S36) with a recorded capacity of 227.7 MW, and has been generating since 2018-12-11.
Planning and build timeline
| Application submitted | 2012-06-29 |
| Permission granted | 2014-06-06 23 months after submission |
| Operational | 2018-12-11 54 months after consent |
Scottish Government (S36)’s record on onshore wind
Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Garrogie Hydro Scheme Small Hydro · Operational | 2 | 7.1 km |
Glendoe Hydro Scheme Large Hydro · Operational | 100 | 8.3 km |
River E Hydro Scheme Small Hydro · Operational | 3 | 10.7 km |
Bhlaraidh (previously Balmacaan) Wind Onshore · Operational | 110 | 10.8 km |
Corriegarth Wind Onshore · Operational | 69.5 | 12.3 km |
Torrdhuin, Auchteraw Battery Storage Facility Battery · Operational | 49.9 | 12.4 km |
Livishie Large Hydro · Operational | 15 | 12.7 km |
Foyers Falls Large Hydro · Operational | 5.2 | 13.4 km |
How big is Stronelairg Wind Farm?
Stronelairg Wind Farm has a recorded installed capacity of 227.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stronelairg Wind Farm?
REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stronelairg Wind Farm approved and built?
The application was submitted on 2012-06-29. Permission was granted on 2014-06-06, 23 months later. The site became operational on 2018-12-11, 54 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4597.
Novarly Parcel · official public data, read properly · parcel.novarly.com