Strath of Brydock

Strath of Brydock is operational in Aberdeenshire with a recorded capacity of 4.6 MW, and has been generating since 2009-06-01.

4.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-06-01
Wind Onshore
Technology
Green Cat Renewables
Aberdeenshire
Authority
Scotland

Planning and build timeline

Application submitted2006-08-29
Permission granted2008-02-25
18 months after submission
Operational2009-06-01
15 months after consent

Aberdeenshire’s record on onshore wind

Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire

Other built sites within 15 km

SiteMWDistance
Strath of Brydock - Extension
Wind Onshore · Operational
2.30 km
Gawnsmoss Cluster
Wind Onshore · Operational
2.42 km
Deuchries
Wind Onshore · Operational
6.94.5 km
Mornflake Oats Wind Turbine
Wind Onshore · Operational
2.35.4 km
Boyndie Airfield
Wind Onshore · Operational
16.75.6 km
Boyndie Airfield Extension
Wind Onshore · Operational
2.35.7 km
Deuchries Windfarm (extension) (Bradley 2)
Wind Onshore · Operational
4.76.2 km
Auchinderran Wind Farm
Wind Onshore · Operational
2.46.4 km

How big is Strath of Brydock?

Strath of Brydock has a recorded installed capacity of 4.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Strath of Brydock?

REPD records the operator as Green Cat Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Strath of Brydock approved and built?

The application was submitted on 2006-08-29. Permission was granted on 2008-02-25, 18 months later. The site became operational on 2009-06-01, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2922.