Renewable sites › Deuchries Windfarm (extension) (Bradley 2)
Deuchries Windfarm (extension) (Bradley 2)
Deuchries Windfarm (extension) (Bradley 2) is an operational 4.7 MW onshore wind farm in Aberdeenshire, generating since 1 August 2024. Planning permission was granted on 30 August 2019, 7 months after submission. Operator of record: Blackfinch Energy.
Planning and build timeline
| Application submitted | 17 January 2019 |
| Permission granted | 30 August 2019 7 months after submission |
| Operational | 1 August 2024 59 months after consent |
Screening a site of your own?
Aberdeenshire approves 69% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Deuchries Windfarm (extension) (Bradley 2)’s recorded coordinate — swap in your own postcode or coordinates.
Aberdeenshire’s record on onshore wind
Aberdeenshire has decided 118 onshore wind schemes and approved 69%, taking a median of 12.7 months. See every onshore wind scheme decision in Aberdeenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 6.9 | 2.1 km |
Wind Onshore · Operational | 2.4 | 2.5 km |
Wind Onshore · Operational | 2.4 | 5.6 km |
Wind Onshore · Operational | 4.6 | 6.2 km |
Wind Onshore · Operational | 2.3 | 6.2 km |
Wind Onshore · Operational | 4.6 | 8.2 km |
Wind Onshore · Operational | 6.9 | 9 km |
Wind Onshore · Operational | 2.3 | 10 km |
How big is Deuchries Windfarm (extension) (Bradley 2)?
Deuchries Windfarm (extension) (Bradley 2) has a recorded installed capacity of 4.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Deuchries Windfarm (extension) (Bradley 2)?
REPD records the operator as Blackfinch Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Deuchries Windfarm (extension) (Bradley 2) approved and built?
The application was submitted on 17 January 2019. Permission was granted on 30 August 2019, 7 months later. The site became operational on 1 August 2024, 59 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7304.