Stonish Hill (Bilsthorpe) is an operational 10.3 MW onshore wind farm in Newark and Sherwood, generating since 31 March 2013. Planning permission was granted on 16 March 2009, 21 months after submission. Operator of record: REG Power Management (John Laing/Peel Energy).
Planning and build timeline
| Application submitted | 8 June 2007 |
| Permission granted | 16 March 2009 21 months after submission |
| Operational | 31 March 2013 48 months after consent |
Screening a site of your own?
Newark and Sherwood approves 60% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stonish Hill (Bilsthorpe)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Newark and Sherwood’s record on onshore wind
Newark and Sherwood has decided 5 onshore wind schemes and approved 60%, taking a median of 15.4 months. See every onshore wind scheme decision in Newark and Sherwood →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 11.9 | 0.4 km |
Compressed Air Energy Storage · Operational | — | 1 km |
Anaerobic Digestion · Operational | 2.2 | 1.2 km |
Solar Photovoltaics · Operational | 4.8 | 1.2 km |
Solar Photovoltaics · Operational | 5 | 3.2 km |
Solar Photovoltaics · Operational | 2.6 | 4.1 km |
Solar Photovoltaics · Operational | 4.2 | 4.9 km |
Wind Onshore · Operational | 15 | 9.9 km |
How big is Stonish Hill (Bilsthorpe)?
Stonish Hill (Bilsthorpe) has a recorded installed capacity of 10.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stonish Hill (Bilsthorpe)?
REPD records the operator as REG Power Management (John Laing/Peel Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stonish Hill (Bilsthorpe) approved and built?
The application was submitted on 8 June 2007. Permission was granted on 16 March 2009, 21 months later. The site became operational on 31 March 2013, 48 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3739.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode