Novarly ParcelRenewable sites

Renewable sitesLand South Off Ollerton Road

Land South Off Ollerton Road

Land South Off Ollerton Road is operational in Newark and Sherwood with a recorded capacity of 4.2 MW, and has been generating since 2017-01-15.

4.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-01-15
Solar Photovoltaics
Technology
Anesco
Newark and Sherwood
Authority
England

Planning and build timeline

Application submitted2015-05-22
Permission granted2016-06-07
13 months after submission
Operational2017-01-15
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Newark and Sherwood’s record on solar

Newark and Sherwood has decided 25 solar farms and approved 96%, taking a median of 4.9 months. See every solar farm decision in Newark and Sherwood

Other built sites within 15 km

SiteMWDistance
Rufford Lane
Solar Photovoltaics · Operational
2.63.2 km
Stud Farm, Rufford (Farm AD)
Anaerobic Digestion · Operational
2.23.7 km
Eakring Solar Farm
Solar Photovoltaics · Operational
11.94.6 km
Stonish Hill (Bilsthorpe)
Wind Onshore · Operational
10.34.9 km
Cheesecake Energy Air Energy Storage
Compressed Air Energy Storage · Operational
5.1 km
Netherfield Lane
Solar Photovoltaics · Operational
19.75.4 km
Bilsthorpe Quarry Solar Park
Solar Photovoltaics · Operational
4.85.4 km
Bilsthorpe (Land off Forest Lane)
Solar Photovoltaics · Operational
56.8 km

How big is Land South Off Ollerton Road?

Land South Off Ollerton Road has a recorded installed capacity of 4.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land South Off Ollerton Road?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land South Off Ollerton Road approved and built?

The application was submitted on 2015-05-22. Permission was granted on 2016-06-07, 13 months later. The site became operational on 2017-01-15, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5293.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council