Novarly ParcelRenewable sites

Renewable sitesStob House Farm

Stob House Farm

Stob House Farm is operational in Hartlepool with a recorded capacity of 4.9 MW, and has been generating since 2016-09-01.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-09-01
Solar Photovoltaics
Technology
Anesco
Hartlepool
Authority
England

Planning and build timeline

Application submitted2015-09-10
Permission granted2016-01-22
4 months after submission
Operational2016-09-01
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hartlepool’s record on solar

Hartlepool has decided 11 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Hartlepool

Other built sites within 15 km

SiteMWDistance
Land at Bluehouse Farm
Solar Photovoltaics · Operational
51.8 km
Red Gap Moor Wind Farm
Wind Onshore · Operational
12.52.2 km
Teesside EfW
EfW Incineration · Operational
19.24.7 km
Teesside EfW (extension)
EfW Incineration · Operational
104.7 km
North East Energy Recovery Centre (adjacent to Teesside EfW)
EfW Incineration · Operational
214.7 km
Haverton Hill Incinerator
EfW Incineration · Operational
20.14.9 km
Billingham Chemical Works
EfW Incineration · Operational
124.9 km
Dean Group Business Park - Hartlepool
Anaerobic Digestion · Operational
5.16 km

How big is Stob House Farm?

Stob House Farm has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stob House Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stob House Farm approved and built?

The application was submitted on 2015-09-10. Permission was granted on 2016-01-22, 4 months later. The site became operational on 2016-09-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5664.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council