Red Gap Moor Wind Farm
Red Gap Moor Wind Farm is an operational 12.5 MW onshore wind farm in Hartlepool, generating since 15 February 2017. Planning permission was granted on 31 March 2011, 22 months after submission. Operator of record: Capital Dynamics.
Planning and build timeline
| Application submitted | 20 May 2009 |
| Permission granted | 31 March 2011 22 months after submission |
| Operational | 15 February 2017 71 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Hartlepool: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Red Gap Moor Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Teesmouth and Cleveland Coast SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4.9 | 2.2 km |
Solar Photovoltaics · Operational | 5 | 3.7 km |
Wind Onshore · Operational | 20.5 | 5.3 km |
Wind Onshore · Operational | 14 | 5.3 km |
Wind Onshore · Operational | 5.5 | 5.4 km |
Solar Photovoltaics · Under Construction | 120 | 6 km |
EfW Incineration · Operational | 19.2 | 6.9 km |
EfW Incineration · Operational | 21 | 6.9 km |
How big is Red Gap Moor Wind Farm?
Red Gap Moor Wind Farm has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Red Gap Moor Wind Farm?
REPD records the operator as Capital Dynamics. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Red Gap Moor Wind Farm approved and built?
The application was submitted on 20 May 2009. Permission was granted on 31 March 2011, 22 months later. The site became operational on 15 February 2017, 71 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4415.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode