Novarly ParcelRenewable sites

Renewable sitesLand Off Folly Lane

Land Off Folly Lane

Land Off Folly Lane is an operational 5 MW solar farm in East Lindsey, generating since 7 March 2016. Planning permission was granted on 17 September 2015, 3 months after submission. Operator of record: Solar Century/ Bluefield Solar.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 7 March 2016
Solar Photovoltaics
Technology
Solar Century/ Bluefield Solar
East Lindsey
Authority
England

Planning and build timeline

Application submitted18 June 2015
Permission granted17 September 2015
3 months after submission
Operational7 March 2016
6 months after consent

Screening a site of your own?

RedlineUK · £39

East Lindsey approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land Off Folly Lane’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Lindsey’s record on solar

East Lindsey has decided 28 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in East Lindsey

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
34.5 km
Anaerobic Digestion · Operational
1.48.7 km
Solar Photovoltaics · Operational
910.3 km
Solar Photovoltaics · Operational
511 km
Solar Photovoltaics · Operational
1211.1 km
Solar Photovoltaics · Under Construction
49.913.5 km
Anaerobic Digestion · Operational
1.414.3 km
Solar Photovoltaics · Operational
22.614.9 km

How big is Land Off Folly Lane?

Land Off Folly Lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land Off Folly Lane?

REPD records the operator as Solar Century/ Bluefield Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land Off Folly Lane approved and built?

The application was submitted on 18 June 2015. Permission was granted on 17 September 2015, 3 months later. The site became operational on 7 March 2016, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5483.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode