Renewable sites › Southdown Quarry
Southdown Quarry
Southdown Quarry is operational in Cornwall with a recorded capacity of 1.5 MW, and has been generating since 2015-12-21.
Planning and build timeline
| Application submitted | 2014-07-16 |
| Permission granted | 2014-10-09 3 months after submission |
| Operational | 2015-12-21 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Mendennick Farm Solar Photovoltaics · Operational | 2.8 | 2.8 km |
Princess Yachts Limited - Solar PV system Solar Photovoltaics · Under Construction | 0.7 | 3.1 km |
Anthony Estate Solar Farm Solar Photovoltaics · Operational | 4.7 | 3.5 km |
North Yard EfW EfW Incineration · Operational | 22.5 | 4.7 km |
Chelson Meadow 2 Landfill Gas · Operational | 1.4 | 6.3 km |
Chelson Meadow Gas to Energy Scheme Landfill Gas · Operational | 1.8 | 6.3 km |
Ernesettle Solar Farm Solar Photovoltaics · Operational | 4.1 | 6.3 km |
Warleigh Barton Solar Farm Solar Photovoltaics · Operational | 5 | 9.1 km |
How big is Southdown Quarry?
Southdown Quarry has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Southdown Quarry?
REPD records the operator as Ethical Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Southdown Quarry approved and built?
The application was submitted on 2014-07-16. Permission was granted on 2014-10-09, 3 months later. The site became operational on 2015-12-21, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2059.