Novarly ParcelRenewable sites

Renewable sitesChelson Meadow 2

Chelson Meadow 2

Chelson Meadow 2 is an operational 1.4 MW landfill gas site in Plymouth, generating since 2 August 1999. Planning permission was granted on 18 July 1998, 14 months after submission. Operator of record: Combined Landfill Projects (CLP).

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2 August 1999
Landfill Gas
Technology
Combined Landfill Projects (CLP)
Plymouth
Authority
England

Planning and build timeline

Application submitted21 May 1997
Permission granted18 July 1998
14 months after submission
Operational2 August 1999
12 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Plymouth: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chelson Meadow 2’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.80 km
Solar Photovoltaics · Under Construction
0.73.3 km
Biomass (dedicated) · Operational
1.55.1 km
EfW Incineration · Operational
22.55.7 km
Solar Photovoltaics · Operational
8.76.1 km
Solar Photovoltaics · Operational
1.56.3 km
Solar Photovoltaics · Operational
4.16.5 km
Solar Photovoltaics · Operational
147.4 km

How big is Chelson Meadow 2?

Chelson Meadow 2 has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chelson Meadow 2?

REPD records the operator as Combined Landfill Projects (CLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chelson Meadow 2 approved and built?

The application was submitted on 21 May 1997. Permission was granted on 18 July 1998, 14 months later. The site became operational on 2 August 1999, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 732.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode