Renewable sites › Mendennick Farm
Mendennick Farm
Mendennick Farm is an operational 2.8 MW solar farm in Cornwall, generating since 15 October 2015. Planning permission was granted on 13 February 2015, 3 months after submission. Operator of record: REG Solarpower.
Planning and build timeline
| Application submitted | 25 November 2014 |
| Permission granted | 13 February 2015 3 months after submission |
| Operational | 15 October 2015 8 months after consent |
Screening a site of your own?
Cornwall approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Mendennick Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 4.7 | 0.8 km |
Solar Photovoltaics · Operational | 1.5 | 2.8 km |
Solar Photovoltaics · Under Construction | 0.7 | 5.7 km |
EfW Incineration · Operational | 22.5 | 6.1 km |
Solar Photovoltaics · Operational | 4.1 | 7.6 km |
Landfill Gas · Operational | 1.8 | 9 km |
Landfill Gas · Operational | 1.4 | 9 km |
Solar Photovoltaics · Operational | 1.6 | 9.6 km |
How big is Mendennick Farm?
Mendennick Farm has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mendennick Farm?
REPD records the operator as REG Solarpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mendennick Farm approved and built?
The application was submitted on 25 November 2014. Permission was granted on 13 February 2015, 3 months later. The site became operational on 15 October 2015, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4891.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode