Chelson Meadow Gas to Energy Scheme
Chelson Meadow Gas to Energy Scheme is operational in Plymouth with a recorded capacity of 1.8 MW, and has been generating since 1998-09-04.
Planning and build timeline
| Application submitted | 1997-05-21 |
| Permission granted | 1998-07-18 14 months after submission |
| Operational | 1998-09-04 2 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Chelson Meadow 2 Landfill Gas · Operational | 1.4 | 0 km |
Princess Yachts Limited - Solar PV system Solar Photovoltaics · Under Construction | 0.7 | 3.3 km |
Derriford Hospital Biomass (dedicated) · Operational | 1.5 | 5.1 km |
North Yard EfW EfW Incineration · Operational | 22.5 | 5.7 km |
Balls Wood Solar Farm Solar Photovoltaics · Operational | 8.7 | 6.1 km |
Southdown Quarry Solar Photovoltaics · Operational | 1.5 | 6.3 km |
Ernesettle Solar Farm Solar Photovoltaics · Operational | 4.1 | 6.5 km |
Newnham Estate Solar Photovoltaics · Operational | 14 | 7.4 km |
How big is Chelson Meadow Gas to Energy Scheme?
Chelson Meadow Gas to Energy Scheme has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Chelson Meadow Gas to Energy Scheme?
REPD records the operator as DEVON WASTE MANAGEMENT LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Chelson Meadow Gas to Energy Scheme approved and built?
The application was submitted on 1997-05-21. Permission was granted on 1998-07-18, 14 months later. The site became operational on 1998-09-04, 2 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 610.
Novarly Parcel · official public data, read properly · parcel.novarly.com