Princess Yachts Limited - Solar PV system

Princess Yachts Limited - Solar PV system is under construction in Plymouth with a recorded capacity of 0.7 MW.

0.7 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Princess Yachts International
Plymouth
Authority
England

Planning and build timeline

Application submitted2021-07-30
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Plymouth’s record on solar

Plymouth has decided 26 solar farms and approved 100%, taking a median of 1.7 months. See every solar farm decision in Plymouth

Other built sites within 15 km

SiteMWDistance
Southdown Quarry
Solar Photovoltaics · Operational
1.53.1 km
Chelson Meadow 2
Landfill Gas · Operational
1.43.3 km
Chelson Meadow Gas to Energy Scheme
Landfill Gas · Operational
1.83.3 km
North Yard EfW
EfW Incineration · Operational
22.53.5 km
Ernesettle Solar Farm
Solar Photovoltaics · Operational
4.14.9 km
Mendennick Farm
Solar Photovoltaics · Operational
2.85.7 km
Derriford Hospital
Biomass (dedicated) · Operational
1.56.4 km
Anthony Estate Solar Farm
Solar Photovoltaics · Operational
4.76.5 km

How big is Princess Yachts Limited - Solar PV system?

Princess Yachts Limited - Solar PV system has a recorded installed capacity of 0.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Princess Yachts Limited - Solar PV system?

REPD records the operator as Princess Yachts International. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Princess Yachts Limited - Solar PV system approved and built?

The application was submitted on 2021-07-30. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9412.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council