North Yard EfW

North Yard EfW is an operational 22.5 MW energy-from-waste plant in Plymouth, generating since 27 April 2015. Planning permission was granted on 3 February 2012, 9 months after submission. Operator of record: MVV Environment.

22.5 MW
Capacity
as recorded in REPD
Operational
Status
since 27 April 2015
EfW Incineration
Technology
MVV Environment
Plymouth
Authority
England

Planning and build timeline

Application submitted10 May 2011
Permission granted3 February 2012
9 months after submission
Operational27 April 2015
39 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Plymouth: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with North Yard EfW’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.11.7 km
Solar Photovoltaics · Under Construction
0.73.5 km
Solar Photovoltaics · Operational
54.5 km
Solar Photovoltaics · Operational
1.54.7 km
Solar Photovoltaics · Operational
55.5 km
Biomass (dedicated) · Operational
1.55.5 km
Landfill Gas · Operational
1.85.7 km
Landfill Gas · Operational
1.45.7 km

How big is North Yard EfW?

North Yard EfW has a recorded installed capacity of 22.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Yard EfW?

REPD records the operator as MVV Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Yard EfW approved and built?

The application was submitted on 10 May 2011. Permission was granted on 3 February 2012, 9 months later. The site became operational on 27 April 2015, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 941.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode