Novarly ParcelRenewable sites

Renewable sitesSouthbrook Solar Farm

Southbrook Solar Farm

Southbrook Solar Farm is operational in Monmouthshire with a recorded capacity of 5 MW, and has been generating since 2016-05-15.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-05-15
Solar Photovoltaics
Technology
Sunventures (Suncredit UK)
Monmouthshire
Authority
Wales

Planning and build timeline

Application submitted2015-07-13
Permission granted2015-12-03
5 months after submission
Operational2016-05-15
5 months after consent

Monmouthshire’s record on solar

Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire

Other built sites within 15 km

SiteMWDistance
Oak Grove Farm
Solar Photovoltaics · Operational
5.72.6 km
Rhewl Farm
Solar Photovoltaics · Operational
65.2 km
Land adjacent to Church Road
Solar Photovoltaics · Operational
3.55.4 km
Avonmouth Port II
Wind Onshore · Operational
56.4 km
Severn Road
Wind Onshore · Operational
4.26.4 km
Severnside Energy Recovery Centre
EfW Incineration · Operational
327 km
Severn Road Solar Park
Solar Photovoltaics · Operational
1.87.2 km
Sedbury Park
Solar Photovoltaics · Operational
57.4 km

How big is Southbrook Solar Farm?

Southbrook Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Southbrook Solar Farm?

REPD records the operator as Sunventures (Suncredit UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Southbrook Solar Farm approved and built?

The application was submitted on 2015-07-13. Permission was granted on 2015-12-03, 5 months later. The site became operational on 2016-05-15, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5379.