Southbrook Solar Farm
Southbrook Solar Farm is operational in Monmouthshire with a recorded capacity of 5 MW, and has been generating since 2016-05-15.
Planning and build timeline
| Application submitted | 2015-07-13 |
| Permission granted | 2015-12-03 5 months after submission |
| Operational | 2016-05-15 5 months after consent |
Monmouthshire’s record on solar
Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Oak Grove Farm Solar Photovoltaics · Operational | 5.7 | 2.6 km |
Rhewl Farm Solar Photovoltaics · Operational | 6 | 5.2 km |
Land adjacent to Church Road Solar Photovoltaics · Operational | 3.5 | 5.4 km |
Avonmouth Port II Wind Onshore · Operational | 5 | 6.4 km |
Severn Road Wind Onshore · Operational | 4.2 | 6.4 km |
Severnside Energy Recovery Centre EfW Incineration · Operational | 32 | 7 km |
Severn Road Solar Park Solar Photovoltaics · Operational | 1.8 | 7.2 km |
Sedbury Park Solar Photovoltaics · Operational | 5 | 7.4 km |
How big is Southbrook Solar Farm?
Southbrook Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Southbrook Solar Farm?
REPD records the operator as Sunventures (Suncredit UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Southbrook Solar Farm approved and built?
The application was submitted on 2015-07-13. Permission was granted on 2015-12-03, 5 months later. The site became operational on 2016-05-15, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5379.