Southbrook Solar Farm

Southbrook Solar Farm is an operational 5 MW solar farm in Monmouthshire, generating since 15 May 2016. Planning permission was granted on 3 December 2015, 5 months after submission. Operator of record: Sunventures (Suncredit UK).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 May 2016
Solar Photovoltaics
Technology
Sunventures (Suncredit UK)
Monmouthshire
Authority
Wales

Planning and build timeline

Application submitted13 July 2015
Permission granted3 December 2015
5 months after submission
Operational15 May 2016
5 months after consent

Screening a site of your own?

RedlineUK · £39

Monmouthshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Southbrook Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Monmouthshire’s record on solar

Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
5.72.6 km
Solar Photovoltaics · Operational
65.2 km
Solar Photovoltaics · Operational
3.55.4 km
Wind Onshore · Operational
56.4 km
Wind Onshore · Operational
4.26.4 km
EfW Incineration · Operational
327 km
Solar Photovoltaics · Operational
1.87.2 km
Solar Photovoltaics · Operational
57.4 km

How big is Southbrook Solar Farm?

Southbrook Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Southbrook Solar Farm?

REPD records the operator as Sunventures (Suncredit UK). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Southbrook Solar Farm approved and built?

The application was submitted on 13 July 2015. Permission was granted on 3 December 2015, 5 months later. The site became operational on 15 May 2016, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5379.