Renewable sitesSevernside Energy Recovery Centre

Severnside Energy Recovery Centre

Severnside Energy Recovery Centre is operational in South Gloucestershire with a recorded capacity of 32 MW, and has been generating since 2016-12-14.

32 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-14
EfW Incineration
Technology
SITA UK
South Gloucestershire
Authority
England

Planning and build timeline

Application submitted2009-12-03
Permission granted2011-09-15
21 months after submission
Operational2016-12-14
63 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Severn Road Solar Park
Solar Photovoltaics · Operational
1.81.3 km
Avonmouth Port II
Wind Onshore · Operational
51.3 km
Severn Road
Wind Onshore · Operational
4.21.3 km
Avonmouth Resource Recovery Centre (formerly Severn Road)
EfW Incineration · Operational
341.5 km
Land adjacent to Church Road
Solar Photovoltaics · Operational
3.52.3 km
Severn Road
Battery · Operational
322.5 km
Moorhouse Lane
Solar Photovoltaics · Operational
1.82.9 km
Moorhouse Farm, Moorhouse Lane - Solar Park
Solar Photovoltaics · Under Construction
3.812.9 km

How big is Severnside Energy Recovery Centre?

Severnside Energy Recovery Centre has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Severnside Energy Recovery Centre?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Severnside Energy Recovery Centre approved and built?

The application was submitted on 2009-12-03. Permission was granted on 2011-09-15, 21 months later. The site became operational on 2016-12-14, 63 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 918.