Novarly ParcelRenewable sites

Renewable sitesOak Grove Farm

Oak Grove Farm

Oak Grove Farm is operational in Monmouthshire with a recorded capacity of 5.7 MW, and has been generating since 2017-03-30.

5.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-30
Solar Photovoltaics
Technology
Monmouthshire County Council
Monmouthshire
Authority
Wales

Planning and build timeline

Application submitted2015-03-05
Permission grantednot recorded
Operational2017-03-30

Monmouthshire’s record on solar

Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire

Other built sites within 15 km

SiteMWDistance
Southbrook Solar Farm
Solar Photovoltaics · Operational
52.6 km
Rhewl Farm
Solar Photovoltaics · Operational
62.7 km
Sedbury Park
Solar Photovoltaics · Operational
55.5 km
Tump Solar Farm
Solar Photovoltaics · Operational
56.1 km
Land adjacent to Church Road
Solar Photovoltaics · Operational
3.57 km
Avonmouth Port II
Wind Onshore · Operational
58.7 km
Severn Road
Wind Onshore · Operational
4.28.7 km
Severnside Energy Recovery Centre
EfW Incineration · Operational
329 km

How big is Oak Grove Farm?

Oak Grove Farm has a recorded installed capacity of 5.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Oak Grove Farm?

REPD records the operator as Monmouthshire County Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Oak Grove Farm approved and built?

The application was submitted on 2015-03-05. REPD does not record a grant date. The site became operational on 2017-03-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6493.