Renewable sitesIomart, Clivemont Road - Solar Panels

Iomart, Clivemont Road - Solar Panels

Iomart, Clivemont Road - Solar Panels is operational in Windsor and Maidenhead with a recorded capacity of 0.29 MW, and has been generating since 2024-08-09.

0.29 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-08-09
Solar Photovoltaics
Technology
3ti Energy Hubs Limited
Windsor and Maidenhead
Authority
England

Planning and build timeline

Application submitted2023-06-22
Permission granted2023-08-15
2 months after submission
Operational2024-08-09
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Windsor and Maidenhead’s record on solar

Windsor and Maidenhead has decided 11 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Windsor and Maidenhead

Other built sites within 15 km

SiteMWDistance
Slough Sewage Treatment Works
Sewage Sludge Digestion · Operational
1.26.6 km
Fibrepower, Slough
EfW Incineration · Operational
506.8 km
Slough Heat & Power Station
EfW Incineration · Under Construction
49.96.9 km
Derehams Farm, Derehams Lane - Battery Storage
Battery · Operational
409.5 km
High Heavens Landfill
Landfill Gas · Operational
1.99.5 km
Wapsey's Wood
Landfill Gas · Operational
7.511.3 km
Wapsey's Wood III
Landfill Gas · Operational
111.3 km
Wapsey's Wood II Landfill Site
Landfill Gas · Operational
111.3 km

How big is Iomart, Clivemont Road - Solar Panels?

Iomart, Clivemont Road - Solar Panels has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Iomart, Clivemont Road - Solar Panels?

REPD records the operator as 3ti Energy Hubs Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Iomart, Clivemont Road - Solar Panels approved and built?

The application was submitted on 2023-06-22. Permission was granted on 2023-08-15, 2 months later. The site became operational on 2024-08-09, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14275.