Planning and build timeline
| Application submitted | 2023-06-22 |
| Permission granted | 2023-08-15 2 months after submission |
| Operational | 2024-08-09 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Windsor and Maidenhead’s record on solar
Windsor and Maidenhead has decided 11 solar farms and approved 91%, taking a median of 1.8 months. See every solar farm decision in Windsor and Maidenhead →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Slough Sewage Treatment Works Sewage Sludge Digestion · Operational | 1.2 | 6.6 km |
Fibrepower, Slough EfW Incineration · Operational | 50 | 6.8 km |
Slough Heat & Power Station EfW Incineration · Under Construction | 49.9 | 6.9 km |
Derehams Farm, Derehams Lane - Battery Storage Battery · Operational | 40 | 9.5 km |
High Heavens Landfill Landfill Gas · Operational | 1.9 | 9.5 km |
Wapsey's Wood Landfill Gas · Operational | 7.5 | 11.3 km |
Wapsey's Wood III Landfill Gas · Operational | 1 | 11.3 km |
Wapsey's Wood II Landfill Site Landfill Gas · Operational | 1 | 11.3 km |
How big is Iomart, Clivemont Road - Solar Panels?
Iomart, Clivemont Road - Solar Panels has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Iomart, Clivemont Road - Solar Panels?
REPD records the operator as 3ti Energy Hubs Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Iomart, Clivemont Road - Solar Panels approved and built?
The application was submitted on 2023-06-22. Permission was granted on 2023-08-15, 2 months later. The site became operational on 2024-08-09, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14275.