Renewable sitesSkylark Meadow Solar park

Skylark Meadow Solar park

Skylark Meadow Solar park is operational in South Cambridgeshire with a recorded capacity of 5 MW, and has been generating since 2013-03-19.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-19
Solar Photovoltaics
Technology
Anesco
South Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2012-08-14
Permission granted2012-11-13
3 months after submission
Operational2013-03-19
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Cambridgeshire’s record on solar

South Cambridgeshire has decided 41 solar farms and approved 88%, taking a median of 3.9 months. See every solar farm decision in South Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Fairview Farm
Solar Photovoltaics · Operational
0.25.6 km
Lamp Hill Wimpole Estate
Solar Photovoltaics · Operational
0.47.7 km
Croydon / Church Farm (Royston)
Solar Photovoltaics · Operational
16.58.1 km
Caldecote Manor Farm
Solar Photovoltaics · Operational
59.2 km
Hoback Farm
Solar Photovoltaics · Operational
13.19.6 km
Vine Farm Solar Park
Solar Photovoltaics · Operational
4510 km
Cantelupe Solar Farm
Solar Photovoltaics · Operational
510.2 km
Cotton Farm
Wind Onshore · Operational
2010.7 km

How big is Skylark Meadow Solar park?

Skylark Meadow Solar park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Skylark Meadow Solar park?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Skylark Meadow Solar park approved and built?

The application was submitted on 2012-08-14. Permission was granted on 2012-11-13, 3 months later. The site became operational on 2013-03-19, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1275.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council