Novarly ParcelRenewable sites

Renewable sitesCotton Farm

Cotton Farm

Cotton Farm is an operational 20 MW onshore wind farm in Huntingdonshire, generating since 31 March 2013. Planning permission was granted on 14 December 2010, 28 months after submission. Operator of record: Greencoat UK Wind.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2013
Wind Onshore
Technology
Greencoat UK Wind
Huntingdonshire
Authority
England

Planning and build timeline

Application submitted4 August 2008
Permission granted14 December 2010
28 months after submission
Operational31 March 2013
28 months after consent

Screening a site of your own?

RedlineUK · £39

Huntingdonshire approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Cotton Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Huntingdonshire’s record on onshore wind

Huntingdonshire has decided 10 onshore wind schemes and approved 80%, taking a median of 13.9 months. See every onshore wind scheme decision in Huntingdonshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.25.1 km
Landfill Gas · Operational
25.6 km
Solar Photovoltaics · Operational
55.7 km
Wind Onshore · Operational
6.26.6 km
Landfill Gas · Operational
37.3 km
Solar Photovoltaics · Operational
0.58.4 km
Solar Photovoltaics · Operational
510.7 km
Battery · Under Construction
11.1 km

How big is Cotton Farm?

Cotton Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cotton Farm?

REPD records the operator as Greencoat UK Wind. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cotton Farm approved and built?

The application was submitted on 4 August 2008. Permission was granted on 14 December 2010, 28 months later. The site became operational on 31 March 2013, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3971.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode