Novarly ParcelRenewable sites

Renewable sitesLamp Hill Wimpole Estate

Lamp Hill Wimpole Estate

Lamp Hill Wimpole Estate is an operational 0.4 MW solar farm in South Cambridgeshire, generating since 4 February 2020. REPD does not record the planning grant date. Operator of record: National Trust.

0.4 MW
Capacity
as recorded in REPD
Operational
Status
since 4 February 2020
Solar Photovoltaics
Technology
National Trust
South Cambridgeshire
Authority
England

Planning and build timeline

Application submitted7 February 2019
Permission grantednot recorded
Operational4 February 2020

Screening a site of your own?

RedlineUK · £39

South Cambridgeshire approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lamp Hill Wimpole Estate’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Cambridgeshire’s record on solar

South Cambridgeshire has decided 41 solar farms and approved 88%, taking a median of 3.9 months. See every solar farm decision in South Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
13.11.9 km
Solar Photovoltaics · Operational
16.52.8 km
Solar Photovoltaics · Operational
453.3 km
Solar Photovoltaics · Operational
246.8 km
Solar Photovoltaics · Operational
14.47.2 km
Solar Photovoltaics · Operational
57.7 km
Solar Photovoltaics · Operational
57.9 km
Solar Photovoltaics · Operational
58.4 km

How big is Lamp Hill Wimpole Estate?

Lamp Hill Wimpole Estate has a recorded installed capacity of 0.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lamp Hill Wimpole Estate?

REPD records the operator as National Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lamp Hill Wimpole Estate approved and built?

The application was submitted on 7 February 2019. REPD does not record a grant date. The site became operational on 4 February 2020.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7269.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode