Siddington Solar Farm
Siddington Solar Farm is under construction in Cotswold with a recorded capacity of 19.94 MW.
Planning and build timeline
| Application submitted | 2020-12-23 |
| Permission granted | 2021-05-21 5 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cotswold’s record on solar
Cotswold has decided 18 solar farms and approved 100%, taking a median of 3.8 months. See every solar farm decision in Cotswold →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Duke Of Gloucester Barracks Solar Photovoltaics · Operational | 1.4 | 2.2 km |
Cirencester Solar Farm Battery · Operational | 10 | 3.1 km |
Cirencester Solar Farm Solar Photovoltaics · Operational | 23 | 3.1 km |
Crucis Park Solar Photovoltaics · Operational | 12.5 | 4.6 km |
Kemble Wick Solar Photovoltaics · Operational | 49.9 | 6.3 km |
Chelworth Industrial Estate Solar Park Solar Photovoltaics · Operational | 1 | 8.3 km |
Minety South 2 - Battery Storage Facility Battery · Operational | 49.99 | 9.7 km |
Stonehill Energy Storage / Lower Minety Battery · Operational | 50 | 10.1 km |
How big is Siddington Solar Farm?
Siddington Solar Farm has a recorded installed capacity of 19.94 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Siddington Solar Farm?
REPD records the operator as Gresham House / Anesco Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Siddington Solar Farm approved and built?
The application was submitted on 2020-12-23. Permission was granted on 2021-05-21, 5 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8257.