Cirencester Solar Farm

Cirencester Solar Farm is operational in Cotswold with a recorded capacity of 10 MW, and has been generating since 2022-10-13.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-10-13
Battery
Technology
Warrington Borough Council / Statkraft
Cotswold
Authority
England

Planning and build timeline

Application submitted2015-05-08
Permission granted2015-09-17
4 months after submission
Operational2022-10-13
85 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Cirencester Solar Farm
Solar Photovoltaics · Operational
230 km
Crucis Park
Solar Photovoltaics · Operational
12.51.6 km
Duke Of Gloucester Barracks
Solar Photovoltaics · Operational
1.42.5 km
Siddington Solar Farm
Solar Photovoltaics · Under Construction
19.943.1 km
Kemble Wick
Solar Photovoltaics · Operational
49.99.4 km
Chelworth Industrial Estate Solar Park
Solar Photovoltaics · Operational
19.6 km
Water Eaton Farm / Port Farm
Solar Photovoltaics · Operational
34.810.4 km
Castle Eaton Farm
Solar Photovoltaics · Operational
17.811.4 km

How big is Cirencester Solar Farm?

Cirencester Solar Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cirencester Solar Farm?

REPD records the operator as Warrington Borough Council / Statkraft. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cirencester Solar Farm approved and built?

The application was submitted on 2015-05-08. Permission was granted on 2015-09-17, 4 months later. The site became operational on 2022-10-13, 85 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12791.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council